Is Navi Mumbai International Airport open, and what is flying from it?

The short answerYes. Navi Mumbai International Airport was inaugurated on 8 October 2025, began commercial domestic operations on 25 December 2025 with IndiGo 6E460 from Bengaluru, and flew its first scheduled international service on 15 July 2026, an Air India Express route to Abu Dhabi. Phase 1 handles 20 million passengers a year on one runway.

Last checked 21 August 2026 · AURA ESTATE, Khopoli, Raigad, Maharashtra

Navi Mumbai International Airport is open and flying, and it got there in three separate steps that people routinely collapse into one. Inauguration, first domestic departure and first international departure happened nine months apart from end to end. If you are trying to work out what the airport actually does today, the dates matter more than the announcements do.

When did the airport open?

It opened in stages between October 2025 and July 2026.

Prime Minister Narendra Modi inaugurated the airport on 8 October 2025. An inauguration is a ceremony, not a schedule: no fare-paying passenger flew that day.

Commercial domestic operations began on 25 December 2025, and the first arrival was IndiGo flight 6E460 from Bengaluru, reported by newsonair.gov.in. That is the date the airport started working as an airport.

The first scheduled international flight left on 15 July 2026, an Air India Express service to Abu Dhabi operating three times a week. So the airport spent close to seven months as a domestic-only facility before it became international in practice as well as in name.

Who owns and runs it?

The airport is operated by Navi Mumbai International Airport Limited (NMIAL), a joint venture. Mumbai International Airport Ltd, itself a subsidiary of Adani Airport Holdings, holds 74 per cent. CIDCO, the City and Industrial Development Corporation of Maharashtra, holds 26 per cent.

That split is worth understanding rather than skimming. CIDCO is a state planning body and a landowner, and its minority stake is the reason state government statements about the airport carry weight. The majority partner is a private airport operator that also runs Mumbai's existing airport. In practical terms, one commercial group now operates both of the Mumbai region's airports, and the two are managed as a system rather than as competitors.

Phase 1 cost ₹19,650 crore, per the Press Information Bureau.

What is flying from it right now?

The summer 2026 schedule, which runs from 29 March to 24 October 2026, covers 46 domestic destinations with 1,092 weekly air traffic movements, roughly 156 a day.

The ramp-up has been quick in relative terms. Daily departures rose from 22 at launch to 78 by April 2026. Three carriers are operating: IndiGo, Akasa Air and Air India Express.

The international side is much thinner than the domestic side. As of this update the documented scheduled international service is the thrice-weekly Air India Express route to Abu Dhabi that began on 15 July 2026. If you read a claim about a wider international network, ask which airline, which route and which schedule period it refers to before you rely on it.

How big is Phase 1, and how big is the airport meant to become?

Phase 1 is built for 20 million passengers a year (MPPA) on one runway, with 0.5 million tonnes of cargo capacity. The ultimate plan is 90 MPPA, 3.2 to 3.25 million tonnes of cargo, and four terminals.

PhaseWhat it deliversCapacity targetStatus as at 21 August 2026
Phase 1One runway, first terminal, 0.5 mn tonnes cargo20 MPPABuilt and operating. Inaugurated 8 Oct 2025; domestic from 25 Dec 2025; first international 15 Jul 2026
Phase 2Terminal 2 and a second runway60–65 MPPA by 2029-30Announced, not built. About ₹20,000 crore; work stated to start post-monsoon 2026
Phases 3–4Remaining terminals to complete the master planUltimate 90 MPPA, 3.2–3.25 mn tonnes cargo, four terminalsAnnounced. No official dated schedule

Read that table as a description of intent, not of certainty. Only the first row describes something that exists.

The airport is open, but it is currently a one-runway, 20-million-passenger facility with one scheduled international route. Everything above 20 MPPA is a plan with a date attached, not a thing you can fly through.

What has not happened

Two claims circulate that the record does not support.

Neither of these makes the airport less real. They make the difference between an operating asset and a projection, which is the distinction most property marketing quietly erases.

What is the airport officially called?

Its official name is still "Navi Mumbai International Airport."

Chief Minister Devendra Fadnavis has announced an intention to name it after Loknete D. B. Patil, the farmers' leader associated with the Navi Mumbai land agitations. That is a stated intention. No Union government approval of a renaming is documented. Airport naming in India requires central sanction, and until that is on record, the legal and operational name is the one above.

You will see both names in press coverage, sometimes in the same article. For any contract, booking or official filing, use the official name.

How do you get to it?

The airport was planned with its road access first, which is unusual in India and is the reason it works better than its passenger numbers alone would suggest.

Those are the only drive times used on this site. Where you see a different figure quoted elsewhere, check what it was measured against, at what hour, and by whom.

What this means if you are looking at land nearby

A second airport changes a region's connectivity, its employment map and where planning attention goes. It does not, on its own, do anything predictable to the price of a specific plot, and this page makes no claim about that.

What is fair to say is narrow and factual. The airport exists. It is operating at a fraction of its designed ultimate capacity. The road links to it from the Raigad side of the harbour are built and in use. Whether that matters to a particular parcel depends on the parcel, its title, its zone and its access, none of which an airport improves.

What to check before you rely on an airport claim

What to take away

AURA ESTATE, Khopoli

100 acres of villa plots from 2,250 sq.ft to 10,000 sq.ft on the Mumbai–Pune Expressway, with the 7/12 transferred into your own name. 45 min to Navi Mumbai International Airport, 1 hr 30 min from South Mumbai. Phase 1 launches 15 November 2026.

No payment is collected on this site. An EOI is not a booking or allotment of plot or sale of plot.

This page is general information about Maharashtra land and infrastructure, not legal, tax or investment advice. Rules, rates and project timelines change. Figures are attributed to their source and dated; verify anything you intend to rely on with your own advocate, chartered accountant or the relevant authority before you act on it. AURA ESTATE is a project of Lords of the Lands.