The Mumbai 3.0 investment case

What is Maharashtra actually building around Mumbai right now?

The short answerAs at August 2026 the completed list includes Navi Mumbai International Airport Phase 1, the Atal Setu, the Mumbai-Pune Expressway Missing Link, the full Western Dedicated Freight Corridor and JNPA's expanded container capacity. A larger set is approved and funded but not open, including the Virar-Alibaug corridor and Vadhavan Port. A larger set again is announcement only.

Last checked 21 August 2026 · AURA ESTATE, Khopoli, Raigad, Maharashtra

There is no shortage of lists of Maharashtra infrastructure projects. Almost all of them mix a working airport with a memorandum of understanding and present both as the future. This inventory sorts by status instead: what is finished, what has been awarded but is not open, what has been approved and funded, and what has only been announced. Every figure carries its source and its date.

Completed and open

These are operating assets. Nothing about them depends on a future decision.

ProjectKey figuresOpened or completed
Navi Mumbai International Airport, Phase 1₹19,650 crore per PIB; 20 million passengers a year and 0.5 million tonnes cargo; one runway; operator NMIAL, 74% Mumbai International Airport Ltd and 26% CIDCOInaugurated 8 October 2025; commercial domestic operations from 25 December 2025; first scheduled international flight 15 July 2026, Air India Express to Abu Dhabi
Atal Setu (Mumbai Trans-Harbour Link)21.8 km, six lanes, ₹17,840 to ₹17,843 crore, Sewri to Nhava Sheva and Chirle13 January 2024, per MMRDA
Mumbai-Pune Expressway Missing Link13.3 km, eight lanes, tunnels of 1.6 to 1.75 km and 8.92 km, a 650 m cable-stayed bridge; MSRDC puts the saving at about 6 km and 20 to 25 minutesInaugurated 1 May 2026, open to motorists from 2 May 2026
Western Dedicated Freight Corridor1,506 km, JNPT to Dadri; final JNPT to New Saphale section commissioned31 March 2026, per reporting citing DFCCIL
JNPA container capacityCrossed 10 million TEU annual capacity in January 2025, India's first, on BMCT Phase 2 adding 2.4 million TEU, taking the total to about 10.4 million TEUJanuary 2025, per PIB
Dighi PortOperating multi-cargo port at Rajpuri creek, Murud taluka, owned by Adani Ports and SEZ; two multipurpose berths of about 650 m quay each, about 7 MMT storage yards, a 62,000 KL liquid tank farmAcquired out of insolvency in 2021 for ₹705 crore

On airport operations, the summer 2026 schedule covers 46 domestic destinations and 1,092 weekly air traffic movements, with daily departures rising from 22 at launch to 78 by April 2026, flown by IndiGo, Akasa Air and Air India Express. CIDCO's pre-launch claim of 35 international flights daily from May 2026 was not met, and no cumulative passenger figure has been published.

On the port, JNPA handled 102 million tonnes and 8.17 million TEU in FY 2025-26, against 92.11 million tonnes and 7.30 million TEU in FY 2024-25. Its April to July FY 2026-27 data shows 2,994,861 TEU, up 14.37%, and 36.62 million tonnes, up 11.95%. It is India's largest container port, handling about 50% of the country's containerised cargo, and is ranked 23rd globally.

Awarded but not open, with construction status unverified

This is the category that most inventories get wrong, because "under construction" is asserted far more often than it is documented.

A Cabinet approval is a decision to spend money. It is not a road. On this corridor the Missing Link took from a 13 June 2017 approval to a 2 May 2026 opening.

Announced only

Each of these is an MoU, a tender, a target or a budget line, attributed to a named body on a named date.

The MMRDA budget for FY 2026-27

MMRDA's FY 2026-27 budget is ₹48,072.57 crore, its first surplus budget since 2017-18.

HeadAmount
Total budget₹48,072.57 crore
Development projects (87.42% of the total)₹42,026.14 crore
Metro₹13,838.88 crore
Road corridors₹12,816.53 crore
Growth hubs and urban expansion₹4,600 crore
Reported as for Mumbai 3.0 and K.S.C. New Town₹4,000 crore

A budget allocation is an announcement of intended spending for one financial year. It tells you where an authority's priorities sit, not what will be delivered.

Two clarifications worth carrying

How to use this inventory

What to take away

AURA ESTATE, Khopoli

100 acres of villa plots from 2,250 sq.ft to 10,000 sq.ft on the Mumbai–Pune Expressway, with the 7/12 transferred into your own name. 45 min to Navi Mumbai International Airport, 1 hr 30 min from South Mumbai. Phase 1 launches 15 November 2026.

No payment is collected on this site. An EOI is not a booking or allotment of plot or sale of plot.

This page is general information about Maharashtra land and infrastructure, not legal, tax or investment advice. Rules, rates and project timelines change. Figures are attributed to their source and dated; verify anything you intend to rely on with your own advocate, chartered accountant or the relevant authority before you act on it. AURA ESTATE is a project of Lords of the Lands.